ISO/ASTM TS 52930:2021
p
ISO/ASTM TS 52930:2021
79527
недоступно на русском языке

This document addresses installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ) issues directly related to the additive manufacturing system that has a direct influence on the consolidation of material. The first three elements of process validation, process mapping, risk assessment, and validation planning, are necessary pre-conditions to machine qualification, however, they are outside the scope of this document.

This document covers issues directly related to the AM equipment and does not cover feedstock qualification or post processing beyond powder removal.

Physical facility, personnel, process and material issues are only included to the extent necessary to support machine qualification.


Общая информация 

  •  :  Published
     : 2021-11
  •  : 1
  •  : ISO/TC 261 Additive manufacturing
  •  :
    25.030 Additive manufacturing

Цели в области устойчивого развития

Данный стандарт разработан для достижения следующих Цель устойчивого развития:

Приобрести данный стандарт

ru
Формат Язык
std 1 124 PDF + ePub
std 2 124 Бумажный
  • CHF124

Жизненный цикл


Появились вопросы?

Ознакомьтесь с FAQ

Работа с клиентами
+41 22 749 08 88

Часы работы:
Понедельник – пятница: 09:00-12:00, 14:00-17:00 (UTC+1)

Будьте в курсе актуальных новостей ИСО

Подписывайтесь на наши новости, обзоры, а также на информацию о продуктах.