Тезис
The proposed document provides the life cycle management of concrete structures particularly focusing on the execution stage on the basis of the framework and general principles specified by ISO 22040. This document is applicable to not only newly constructed structures but also existing structures when their life cycle is restarted. This document specifies on how performance requirements should be considered at the execution stage and also how the basic LCM scenario should be updated. Management items at the execution stage are clearly defined and information that may be fed back to the design stage and be transferred to the use stage is described.
Общая информация
-
Текущий статус: В стадии разработки
You can help develop this draft international standard by contacting your national member
Этап: Начало голосования по проекту между-народно-го стандарта: 3 мес. [40.20] -
Версия: 1
-
Технический комитет :ISO/TC 71ICS :91.080.40
- RSS обновления
Жизненный цикл
-
Сейчас
-
00
Предварительная стадия
-
10
Стадия, связанная с внесением предложения
-
20
Подготовительная стадия
-
30
Стадия, связанная с подготовкой проекта комитета
-
40
Стадия, связанная с рассмотрением проекта международного стандарта
-
50
Стадия, на которой осуществляется принятие стандарта
-
60
Стадия, на которой осуществляется публикация
-
90
Стадия пересмотра
-
95
Стадия, на которой осуществляется отмена стандарта
-
00